MEP BIM Modeling and BIM Coordination for TVC Tower, UK
-
Location London, UK
-
Type of Building Commercial and Media (Studios, Offices, Engineering, News Centre)
-
Area 700,000 sq. ft.
-
Structure 8 Floors above ground, Roof, 2 Basements
-
Project Timeline 300 working days
-
Effort 6000 man-hours
-
Team Size Dedicated BIM Modelers, Architects, and a Project Manager
Project Summary
Tesla Outsourcing Services developed a complete BIM Coordinated model for the TVC Tower in London. The client, a well-known onsite construction company in the UK, required a highly detailed model built from scratch. The facility spans 700,000 square feet. We successfully completed the Architectural, Structural, Mechanical, Electrical, and Plumbing models within the required schedule.
Project Execution and Coordination
We assigned a dedicated team of 20 BIM engineers to this challenging project. Ten technicians focused on building the detail-rich Architectural and Structural models. The remaining ten technicians developed the complex Mechanical, Electrical, and Plumbing systems. We created these models in phases using the provided input drawings.
Once modeling was complete, our team performed rigorous clash detection. We successfully coordinated the MEP services with the architectural and structural disciplines to resolve all spatial conflicts before construction.