Dedicated Resource Arrangement Services for NK: End to End Architectural Support

NK is a long-standing client for whom we deliver comprehensive Architectural services. His office in the U.S. (Tennessee) comprises of a core team, while the execution arm of the operations is entirely handled by Tesla Outsourcing Services based here in India.

Team Composition

Team Structure

A dedicated team of 12 members, each playing a vital role in managing and executing projects efficiently

1 Team Lead

Oversees all projects and ensures quality, timelines, and communication

1 Team Lead

Oversees all projects and ensures quality, timelines, and communication

1 Code Specialist

Handles code compliance, permitting, and legal documentation

1 Mail & RFI Coordinator

Manages correspondence, RFI tracking, and document flow

1 Rendering Artist

Produces high-quality visualizations for presentations and client reviews

8 Production Team Members

Focus on drafting, design development, and project documentation

Scope of Work

Project Types

In collaboration with NK, we work on a wide variety of project types, including

  • Hospitality: Hotels
  • Retail & Commercial: C-Stores, India Bazaar, Shops
  • Food & Beverage: Restaurants, Tenant Infill (e.g., restaurants, salons)
  • Residential & Senior Living: Assisted Living, Townships
  • Religious & Cultural: Temples, Mosques
  • Industrial: Warehouses

Services Provided

  • Conceptual Design
  • Schematic Diagrams
  • Construction Documentation (CD Sets)
  • Working Drawings
  • Construction-Stage Support
  • Code-Compliant Revisions and Final Submission
Communication

Communication & Coordination

We maintain direct and seamless communication with NK's office team, ensuring that expectations and are aligned at every phase. Despite the geographical difference, the workflow remains smooth and well-coordinated.

Client & Consultant Communication

Client & Consultant Communication

Primarily via emails and calls for project updates, reviews, and approvals.

Coordination with Neeraj

Coordination with NK

Conducted through Microsoft Teams, scheduled meetings, and emails for efficient project management.

Microsoft Teams Microsoft Teams
Dropbox Dropbox
Microsoft Outlook Microsoft Outlook
Microsoft SharePoint Microsoft SharePoint
Zoom Workplace Zoom Workplace
Cloud base File Sharing Cloud Based File Sharing Platforms

Daily Coordination with NK

To ensure clarity and maintain project momentum, we hold daily meetings with NK, which serve as a cornerstone of our workflow. These meetings typically include

  • Project Briefing

    NK provides updates on current projects and outlines the tasks for the day.

  • Scope Discussion

    We review the overall project scope and specific client requirements.

  • Client Inputs

    Any new inputs or feedback from the client are discussed in detail.

  • Doubt Clarification

    We address any project-related or code-related questions, ensuring a clear understanding before proceeding.

Coordination with Neeraj
Workflow

Workflow Overview

  • Project Assigned by NK to our team.
  • We develop a Schematic Diagram based on initial concepts.
  • The CD Sets and Working Drawings are created with precision and attention to compliance.
  • During the Construction Stage, we provide detailed support and real-time coordination.
  • The final set of drawings is submitted to the local council for review.
  • Upon receiving markups, our team promptly makes necessary revisions based on code requirements, ensuring smooth progression to the next phase.

Project Workflow in Detail

The workflow is customed to each project but generally follows these steps

Receiving Project Inputs

01
  • Directly from Clients: We receive site information and design requirements.
  • Via NK: Inputs are coordinated and shared with us by NK after client meetings.

In both cases, once inputs are received, we begin developing the project.

Initial Design - Floor Plan

02
  • We start by creating the floor plan based on the requirements.
  • The plan is shared with the owner or NK for review and feedback.
  • After necessary revisions and approvals, we move on to developing the complete drawing set.

Drawing Set Development

03
  • The full architectural set is developed according to the city's code requirements and the project type.
  • We then coordinate with MEP and structural consultants, integrating their inputs into our drawings.

Quality Check & Code Submittal

04
  • Once the full drawing set is complete, we conduct a thorough quality check.
  • The final set is prepared for code submittal to the city.

Legal Forms & Applications

05
  • Simultaneously, we apply for any required legal documents early in the process to avoid delays.
  • Examples include
    • TDLR (Texas)
    • MLGW (Memphis)
    • Grease Trap Applications (for restaurant projects)

These forms are submitted ahead of time due to long processing periods.

Addressing Code Comments

06
  • After submittal, we receive code comments from the city.
  • We
    • Review and implement the necessary changes
    • Coordinate with consultants as needed
    • Resubmit for approval

Note: Some projects may require multiple rounds of resubmittals (usually 1-3) depending on the city and complexity.

Final Approval

07
  • We ensure ongoing coordination with the city officials, project owner, and consultants.
  • The process concludes once full project approval is obtained.
Compliance

Code Compliance - A Strategic Strength

Our team specializes in creating code-compliant drawings that align with state-specific U.S. codes. This not only ensures timely approval from local councils but also significantly reduces the number of review cycles. Our thorough understanding of jurisdictional requirements adds substantial value to NK's projects.

  • Upload Plans
    Upload Plans

    Submit drafted plans to the city portal

  • Coordinate with Authority
    Coordinate with Authority

    Engage with local authorities for feedback

  • Review Comments
    Review Comments

    Analyze feedback from authorities

  • Revise Plans
    Revise Plans

    Make necessary changes based on feedback

Planning

Time Zone Considerations & Proactive Planning

Due to the time difference between our team and the client/Project Types, we take a proactive approach to project delivery

  • We aim to complete our tasks a day in advance, ensuring time for reviews, revisions, and adjustments before deadlines.
  • This practice helps avoid delays and ensures we're always prepared with the required details and coordination when needed.

This structured daily interaction helps us stay aligned with the client's expectations, maintain high standards, and deliver on time.

Time Zone Considerations & Proactive Planning
Savings

Efficiency and Cost Savings

  1. Tesla Outsourcing Services handles 100+ projects per quarter for NK, all executed in collaboration between his U.S. office and our India-based team.
  2. With the entire production team located in India, significant cost savings are realized without compromising quality or turnaround time.
  3. Estimated cost savings range between 40%-60%, depending on project complexity and duration.
Projects

Construction Documentation Set Projects

Projects executed with compelete CD Sets along with Code Compliance

La Quinta Jackson

La Quinta Jackson

Developing a complete set of Construction Drawings with equipment schedules for the hotel La Quinta in Jackson, Tennessee with adherence to architectural standards and building codes specific to Tennessee, United States.

Read the Case Study Arrow
India Bazar

India Bazar

Accurate documentation of existing conditions marked for demolition and the modeling of proposed new construction by leveraging existing CAD documentation and photograph records provided.

Read the Case Study Arrow

Partner with us and benefit from synergy between your U.S. based office and our India-based execution team! Contact us now to build your offshore team.

Contact Us
60%

Experience exceptional return on investment with our Dedicated Resource Arrangement for AEC, achieving cost savings of up to 60%!

Our Latest Blogs