Dedicated Resource Arrangement Services for NK: End to End Architectural Support
NK is a long-standing client for whom we deliver comprehensive Architectural services. His office in the U.S. (Tennessee) comprises of a core team, while the execution arm of the operations is entirely handled by Tesla Outsourcing Services based here in India.
Team Structure
A dedicated team of 12 members, each playing a vital role in managing and executing projects efficiently
Oversees all projects and ensures quality, timelines, and communication
Oversees all projects and ensures quality, timelines, and communication
Handles code compliance, permitting, and legal documentation
Manages correspondence, RFI tracking, and document flow
Produces high-quality visualizations for presentations and client reviews
Focus on drafting, design development, and project documentation
Project Types
In collaboration with NK, we work on a wide variety of project types, including
- Hospitality: Hotels
- Retail & Commercial: C-Stores, India Bazaar, Shops
- Food & Beverage: Restaurants, Tenant Infill (e.g., restaurants, salons)
- Residential & Senior Living: Assisted Living, Townships
- Religious & Cultural: Temples, Mosques
- Industrial: Warehouses
Services Provided
- Conceptual Design
- Schematic Diagrams
- Construction Documentation (CD Sets)
- Working Drawings
- Construction-Stage Support
- Code-Compliant Revisions and Final Submission
Communication & Coordination
We maintain direct and seamless communication with NK's office team, ensuring that expectations and are aligned at every phase. Despite the geographical difference, the workflow remains smooth and well-coordinated.
Client & Consultant Communication
Primarily via emails and calls for project updates, reviews, and approvals.
Coordination with NK
Conducted through Microsoft Teams, scheduled meetings, and emails for efficient project management.
Daily Coordination with NK
To ensure clarity and maintain project momentum, we hold daily meetings with NK, which serve as a cornerstone of our workflow. These meetings typically include
-
Project Briefing
NK provides updates on current projects and outlines the tasks for the day.
-
Scope Discussion
We review the overall project scope and specific client requirements.
-
Client Inputs
Any new inputs or feedback from the client are discussed in detail.
-
Doubt Clarification
We address any project-related or code-related questions, ensuring a clear understanding before proceeding.
Workflow Overview
- Project Assigned by NK to our team.
- We develop a Schematic Diagram based on initial concepts.
- The CD Sets and Working Drawings are created with precision and attention to compliance.
- During the Construction Stage, we provide detailed support and real-time coordination.
- The final set of drawings is submitted to the local council for review.
- Upon receiving markups, our team promptly makes necessary revisions based on code requirements, ensuring smooth progression to the next phase.
Project Workflow in Detail
The workflow is customed to each project but generally follows these steps
Receiving Project Inputs
01- Directly from Clients: We receive site information and design requirements.
- Via NK: Inputs are coordinated and shared with us by NK after client meetings.
In both cases, once inputs are received, we begin developing the project.
Initial Design - Floor Plan
02- We start by creating the floor plan based on the requirements.
- The plan is shared with the owner or NK for review and feedback.
- After necessary revisions and approvals, we move on to developing the complete drawing set.
Drawing Set Development
03- The full architectural set is developed according to the city's code requirements and the project type.
- We then coordinate with MEP and structural consultants, integrating their inputs into our drawings.
Quality Check & Code Submittal
04- Once the full drawing set is complete, we conduct a thorough quality check.
- The final set is prepared for code submittal to the city.
Legal Forms & Applications
05- Simultaneously, we apply for any required legal documents early in the process to avoid delays. Examples include
- TDLR (Texas)
- MLGW (Memphis)
- Grease Trap Applications (for restaurant projects)
These forms are submitted ahead of time due to long processing periods.
Addressing Code Comments
06- After submittal, we receive code comments from the city.
- We
- Review and implement the necessary changes
- Coordinate with consultants as needed
- Resubmit for approval
Note: Some projects may require multiple rounds of resubmittals (usually 1-3) depending on the city and complexity.
Final Approval
07- We ensure ongoing coordination with the city officials, project owner, and consultants.
- The process concludes once full project approval is obtained.
Code Compliance - A Strategic Strength
Our team specializes in creating code-compliant drawings that align with state-specific U.S. codes. This not only ensures timely approval from local councils but also significantly reduces the number of review cycles. Our thorough understanding of jurisdictional requirements adds substantial value to NK's projects.
-
Upload Plans
Submit drafted plans to the city portal
-
Coordinate with Authority
Engage with local authorities for feedback
-
Review Comments
Analyze feedback from authorities
-
Revise Plans
Make necessary changes based on feedback
Time Zone Considerations & Proactive Planning
Due to the time difference between our team and the client/Project Types, we take a proactive approach to project delivery
- We aim to complete our tasks a day in advance, ensuring time for reviews, revisions, and adjustments before deadlines.
- This practice helps avoid delays and ensures we're always prepared with the required details and coordination when needed.
This structured daily interaction helps us stay aligned with the client's expectations, maintain high standards, and deliver on time.
Efficiency and Cost Savings
- Tesla Outsourcing Services handles 100+ projects per quarter for NK, all executed in collaboration between his U.S. office and our India-based team.
- With the entire production team located in India, significant cost savings are realized without compromising quality or turnaround time.
- Estimated cost savings range between 40%-60%, depending on project complexity and duration.
Construction Documentation Set Projects
Projects executed with compelete CD Sets along with Code Compliance
La Quinta Jackson
Developing a complete set of Construction Drawings with equipment schedules for the hotel La Quinta in Jackson, Tennessee with adherence to architectural standards and building codes specific to Tennessee, United States.
Read the Case Study
India Bazar
Accurate documentation of existing conditions marked for demolition and the modeling of proposed new construction by leveraging existing CAD documentation and photograph records provided.
Read the Case StudyPartner with us and benefit from synergy between your U.S. based office and our India-based execution team! Contact us now to build your offshore team.
Contact UsExperience exceptional return on investment with our Dedicated Resource Arrangement for AEC, achieving cost savings of up to 60%!